Swarcliffe, Leeds:
The Swarcliffe PFI Partnership and Regeneration project aims to address problems of poor housing conditions in council homes, undertake environmental remodelling and support the regeneration of the whole of the Swarcliffe Estate. The project involves the creation of 23 Homezones, the refurbishment of approximately 1640 homes, the creation of a safer and more secure environment by design, the removal of unpopular dwellings and the creation of a better mix of housing types. Swinden House, Rotherham:
Masterplan for the redevelopment of the 6.65 hectare Corus Technology Centre site to provide 192 dwellings, including the conversion of Grade II listed house and adjacent stable block into luxury apartments. Outline planning approval granted January 2002. Froghall, North Staffordshire:
Redevelopment of the 17 hectare site in the Churnet Valley area owned by Bolton Copper Ltd. Includes consolidation of the existing works within two major buildings on site and redevelopment of the remainder of the site for residential and leisure purposes. Butterly Works, Ripley:
Mized use redevelopment of the 11 hectare Butterly Works site, comprising approximately 120 dwellings and alterations to the operational layout of the factory. Manchester City Centre:
Masterplan carried out in collaboration with Llewelyn-Davies, Planners and Urban Designers. Silver medal finalists in Manchester International Urban Design Competition. Retail, commercial, leisure and residential. Stockport, Kings Valley:
B1 Business Park proposal for 70,000 sqm GEA of high specification accommodation on a 10.5 hectares site. First phase of 10,000 sqm completed. Atlantic Street, Altrincham:
Masterplan proposal and implementation of a 4 hectares business and industrial park. Devonshire Street, Ardwick, Manchester:
Site Development Plan for award winning managed workshops for the Afro-Caribbean community, together with a Cash and Carry warehouse. Broadwalk, Salford:
Masterplan proposal for Residential Urban Regeneration Partnership, involving demolition of four storey maisonettes, building of new two storey houses with gardens, community facilities, doctors' surgery and conversion of two tower blocks into student accommodation. Low-rise construction completed. New Street, St Helens:
Re-modelling of 1960's Radburn plan terraced monopitched housing estate into conventional cul-de-sac layout of semi-detached housing. Project completed. Sorthes Hall Campus, Huddersfield University:
Provision of new village of 1,432 student residences with administration buildings and extensive external sports facilities. Project completed. Old Port, Chester:
Masterplan for mixed use commercial, leisure and residential development together with waterfront open space and promenade.